It's raining today so I have time to do this. Besides, the patio is done and Sunday is a day of repose.
Saturday morning we started by laying the string lines. This complicated process was made interesting by the fact that we only had a tiny string level and too much brainpower.
Next, you can see how we've started laying the first row on Saturday night. Much to our dismay, this all came up as day two man number three came with a lovely water level (which I did not see in motion as I was playing marshmallow shooter at the time).
Here the men show an excellent example of a screed board in motion. Notice the hose on the left attached to my flowers. You must first spritz, then screed, then tamp then smooth, then pull up the boards you are screeding on, then fill the board holes then smooth then tamp again. UGH
Believe me when I say that I know this firsthand as it was I that laid the walkway. Screed, haul, brick, screed, haul, brick, drink diet coke.
Here is a lovely demonstration of brick cutting. As you can see, we didn't have the wet saw on day two. Cut, chisel, break, start over cut chisel. We abandoned after day three and just rented.
At dinnertime, we are 1/2 done, all screeded except for the walkway and ready to eat. Good thing I made dinner the night before.
We were blessed with a lovely thunderstorm right at the end of dinner which meant sundaes inside. Now what this means is the rest of the work will be done by the two of us. OOF!